    VINH TAN THERMAL POWER PLANT PROJECT – NAM AN'S STRATEGIC ADVANCE IN THE ENERGY INDUSTRY

    VINH TAN THERMAL POWER PLANT PROJECT at nam an

    The Vinh Tan Thermal Power Plant – one of the key national energy projects, is being built in Vinh Tan commune, Tuy Phong district, Binh Thuan province – where wind and sunshine meet, but it is also full of harshness.

    The project has a total capacity of more than 6,000 MW, is the largest thermal power center in Vietnam, supplying tens of billions of kWh of electricity each year to the southern region, playing a key role in stabilizing the national power grid.

    To realize this project, hundreds of leading engineers, experts and businesses in the energy industry have participated.

    Among them, NAM AN TECHNICAL CO., LTD is proud to be selected as the supplier of industrial valves, technical equipment and automation control solutions – a key link ensuring safe and sustainable operation for the entire system.

    NAM AN'S MISSION IN THE PROJECT

    NAM AN'S MISSION IN THE PROJECT at nam an

    Bringing international standards to the Vietnamese energy industry

    When participating in the Vinh Tan Thermal Power Plant project, Nam An not only brings high-quality products but also transfers modern technology and technical processes, which are inspected according to international standards such as ANSI, API, DIN, JIS.

    Nam An's items include:

    • Providing industrial valve systems for steam, water, compressed air and fuel pipelines.
    • Providing electric – pneumatic controllers, helping to automate factory operations.
    • Providing measuring and regulating equipment for pressure and flow in boiler and turbine areas.
    • Providing technical support, installation and safety inspection.

    All are implemented according to the “turnkey” model, in which Nam An is fully responsible from transportation, installation, pressure testing, commissioning to warranty and periodic maintenance.

    OPERATING CHALLENGES IN A HARSH ENVIRONMENT

    OPERATING CHALLENGES IN A HARSH ENVIRONMENT at nam an

    Specific geography and climate of Binh Thuan

    Tuy Phong area has a hot and dry climate all year round, high salinity due to being near the sea, and an environment containing a lot of salt and water vapor.

    This requires all technical equipment – especially industrial valves and piping systems – to be corrosion resistant, heat resistant, pressure resistant and maintain absolute tightness.

    Thanks to many years of experience in providing equipment for oil and gas refineries, petrochemical plants and water treatment plants, Nam An has quickly provided optimal technical solutions suitable for operating conditions at Vinh Tan.

    Transportation policy plays a vital role

    To bring hundreds of tons of equipment to the Vinh Tan construction site on time, Nam An implemented a special transportation policy specifically for this project.

    All goods are packaged according to international standards, transported by heavy trucks and specialized containers, with GPS monitoring systems and full cargo insurance.

    Strict compliance with procedures in the transportation policy helps all equipment arrive safely, on schedule and without technical deviations – a decisive factor in the success of the installation phase.

    TECHNICAL SOLUTIONS FROM NAM AN

    TECHNICAL SOLUTIONS FROM NAM AN

    Flow and pressure control solutions

    • Nam An provides ball valve, butterfly valve, gate valve and check valve systems – each type is selected based on operating pressure, temperature and actual flow of each area.
    • The electric – pneumatic controllers are designed synchronously, allowing precise flow regulation, limiting energy loss.

    Corrosion protection and equipment protection solutions

    • All equipment is coated with anti-corrosion epoxy coating, hot-dip galvanized paint, suitable for tropical coastal environments.

    In addition, Nam An also provides air filters and safety valves to help maintain system stability under continuous 24/7 operating conditions.

    Optimize operation and maintenance

    • Nam An applies remote monitoring technology, allowing engineers to monitor the operating status of valves and control systems through digital software.

    This helps minimize downtime and improve operating efficiency.

    PROJECT IMPLEMENTATION PROCESS

    PROJECT IMPLEMENTATION PROCESS at nam an

    Survey – Planning – Execution

    Right from the beginning, Nam An's team of engineers conducted surveys of the terrain, environment and operating characteristics of the Vinh Tan Thermal Power Plant.

    From there, the company builds a separate supply process and transportation policy, ensuring absolute safety for equipment throughout the moving process.

    Each stage – from importing equipment, transporting to the construction site, technical inspection, to installation and handover – is controlled by the ISO 9001:2015 standard checklist.

    On-site supervision engineer team

    Nam An's team of engineers are stationed at the construction site, working closely with the Project Management Board and the EPC contractor.

    Thanks to the smooth coordination between engineering and transportation, items are always completed on schedule, without incurring costs outside of the plan.

    PROJECT EFFECTIVENESS

    Contribution to the Vietnamese energy industry

    After going into operation, Vinh Tan Thermal Power Plant has provided a stable electricity output, helping to reduce the pressure of national energy shortages, especially during peak seasons.
    Nam An's participation not only helps the project complete on schedule but also improves operating efficiency, reduces leakage, failure and maintenance costs.

    Economic – technical efficiency

    Thanks to high-quality equipment, the automation of operation is optimized, helping to reduce fuel costs by more than 12% and maintenance costs by 15%/year compared to traditional models.
    This confirms the actual value of the technical solutions and scientific transportation policies that Nam An has implemented.

    PROJECT TEAM SHARING

    “We have to ensure that every piece of equipment – even the smallest valve – arrives at the construction site in perfect condition.
    Each carton is sealed, numbered, inspected and technically handed over.
    That's why Nam An chooses a separate transportation policy, not just to deliver goods but to deliver complete trust.”
    – Nam An project chief engineer.

    FEEDBACK FROM THE INVESTOR

    “Nam An is a reliable technical partner. From the quality of equipment, professional working style to scientific transportation policies – all show seriousness and class.”
    – Representative of the Management Board of Vinh Tan Thermal Power Plant Project.

    POST-PROJECT DEVELOPMENT VISION

    After the success at Vinh Tan, NAM AN TECHNICAL CO., LTD continues to set goals to participate in large-scale projects in the field of:

    • Renewable energy (wind power, solar power).
    • Oil and gas refineries, LNG gas.
    • Industrial water and chemical treatment systems.

    With a team of experienced engineers, international standard operating procedures, and a comprehensive – safe – on-time transportation policy, Nam An continues to affirm its position as a strategic partner in the Vietnamese energy industry.

    PROJECT COOPERATION CONTACT

    NAM AN TECHNICAL CO., LTD

    📍 Address: 67 Mai Chi Tho Avenue, Binh Trung Ward, Ho Chi Minh City

    📞 Hotline: +84-28-22531286 – +84-28-22531285

    📧 Email: sales@naman-tech.vn

    🌐 Website: https://conflow.vn

    The Vinh Tan Thermal Power Plant Project is not only the pride of the Vietnamese energy industry, but also a step forward in affirming the capacity of NAM AN TECHNICAL CO., LTD.
    With a long-term vision, professional working process and effective transportation policies, Nam An has proven the mettle of Vietnamese businesses – solid in technology, dedicated in each project, and reliable in every cooperation.

    Other Project

    Call me: 028-22531286
    Zalo: 028-22531285